Commercial insurance coverage library

Find guides to the commercial insurance lines that may respond to technology property, interruption, liability, construction and workforce exposures.

Browse guides
Business team reviewing documents at an industrial office

Use the same incident across each proposed policy

Start with a concrete loss scenario, the event that caused it, the entity that experienced it and the locations involved. Describe who owns the damaged asset, who has a repair obligation, who earns revenue, and who has made a promise to a customer. Asking whether three policies respond to “downtime” can produce three different answers because the forms may define the triggering event and financial interest differently.

For a design-stage project, first identify construction, transit, testing and operating milestones. For a current operator start with property ownership and customer revenue. For a contractor or technology provider start with services and the work other parties supply. Then record relevant limits, deductibles, waiting periods, sublimits, policy periods, exclusions and any notice or approval requirements.

Project property, testing and delayed income

The builders risk and delay in startup guide explains how project property and delayed revenue create different coverage questions. Review who has an insurable interest, where equipment is kept, how testing is addressed and which events might bring project coverage to an end. Identify the financial interest and specific opening assumptions that should govern any delay analysis. If an independent supplier delay would have stopped an opening anyway, scheduling records will matter as much as the repair date.

An owner who purchases switchgear directly may hold its risk in transit or at storage before physical custody transfers to a contractor. A transportation claim and a project delay review can use the same incident record, yet depend on different attachment points, scheduled locations, causes and financial interests. Check cargo or inland marine provisions, including off-site property and limits, alongside builders risk terms.

Operational property, breakdown and time-element exposures

The property, equipment breakdown and business income library follows events such as electrical failures, utility interruptions and loss of cooling. Assess building property, specialized tools and equipment interests on a valuation basis the business can defend. Include the work involved in restoring operation, such as engineering, removal, shipping, installation and testing where those costs belong in the analysis.

Engineer reviewing construction drawings at the project site

Business income estimates should reflect the actual affected income and continuing expenses, the partial restoration sequence and the terms that govern when covered recovery begins and ends. Review outside dependencies separately, including specific utilities, suppliers or technology providers. Availability, service interruption and contingent business interruption endorsements require careful review of covered services, property, causes and any listed locations.

Customer claims, technology services and contractual liability

Use the cyber and technology E&O library when an outage involves service delivery, data protection or dependency on another provider. A security event, operational failure and allegation that a contractual service was performed incorrectly can implicate distinct insuring agreements. A data center customer may seek reimbursement while the insured incurs its own cost to restore operations. Capture both loss paths.

For the general liability, professional liability, pollution, auto and umbrella review, separate third-party injury or damage allegations from performance promises and the insured’s own costs. Check the business descriptions, geographic and project limits, named and additional insured terms and how a proposed excess layer follows underlying coverage. Match issued forms to the actual contract requirements, including who must show evidence and when.

Corporate, workforce and risk-transfer issues

Construction and technology portfolios may involve employee injuries, rental equipment, vehicles, subcontractors, software providers, corporate governance and customer payments. Assign a program owner to verify each exposure against the lines carried. A certificate can summarize selected policy information. The carrier’s policy and endorsements determine the insured status or terms that apply to a claim. Workers’ compensation and other mandatory matters require review in the applicable jurisdictions.

Build a review file decision-makers can use

The guides below are educational and reflect common insurance review questions. An insurance outcome depends on the actual policies, endorsements, contracts and facts. Bring uncertain obligations, new operations and anticipated project milestones to the risk review.

Explore the guides

Builders risk & delay in startup

Review project property, testing and commissioning terms alongside the proposed coverage for financial losses tied to completion delays.

Property, equipment breakdown & business income

Compare the triggers and financial assumptions behind property, equipment breakdown, utility services and time-element protection.

Cyber liability & technology E&O

Review security incidents and alleged service failures against the actual insurance definitions, customer contracts and continuity requirements.

Cargo insurance for critical technology equipment

Match the insured transit route, cargo custody, temporary storage and reporting terms to costly equipment shipments.

Commercial auto insurance for technology contractors

Identify vehicle ownership, driver and hauling obligations for crews moving equipment and working across critical infrastructure sites.

Commercial crime insurance for technology businesses

Compare employee theft, money and securities, computer fraud and transfer fraud provisions with the actual custody and authorization flow.

Commercial general liability for technology operations

Compare the bodily injury and property damage risks of a data center, technology manufacturer, or contractor with its commercial general liability policy.

Contractors professional liability for design-build delivery

Review design, delegated engineering and construction management services within a contractor's professional liability program.

Design professional liability for data center engineering

Identify claims arising from engineering and design services and document the personnel, contracts and disciplines responsible.

Directors and officers liability for technology companies

Review governance, financing, acquisition and insolvency scenarios before placing private-company directors and officers liability insurance.

Inland marine insurance for tools and contractors equipment

Schedule mobile equipment, leased machinery and specialty tools based on where the property travels, rests and works.

International insurance considerations for technology operations

Review overseas entities, local policies, project requirements and claims-payment arrangements before expanding a technology operation.

Owner and contractor controlled insurance programs

Review which participants and operations are enrolled in a construction wrap-up and how the project coordinates with corporate primary policies.

Pollution liability insurance for data centers

Compare pollution risks at occupied campuses and construction sites across fuel storage, cooling operations and contractor work.

Product liability for technology hardware manufacturers

Review bodily injury and other-property damage allegations involving components, assemblies and installed technology products.

Product recall expense insurance for technology components

Separate covered recall expenses from product warranties, replacement costs and injury or property damage claims.

Social engineering insurance for payment diversion

Review impostor payment requests against insured transfer, computer fraud and social engineering provisions and document independent verification procedures.

Surety bonds for data center construction contracts

Distinguish bid, payment and performance bonds and prepare underwriting information for the actual contract and bond form.

Terrorism insurance considerations for critical infrastructure

Compare property, income and liability coverage for terrorism with lender requirements, concentration and the terms of any U.S. program offer.

Umbrella and excess liability insurance for technology risks

Review which primary liability policies an excess tower follows and how gaps can appear between layers.

Workers' compensation for data center employers and contractors

Document employees, duties, job locations and project enrollment before work moves between data centers or jurisdictions.