
List each entity and place where it does business
International activity can begin with a foreign supplier or a short commissioning trip, then expand to project vehicles, customer premises, employees or physical assets. Identify the contracting entity, employer, asset owner and country at each location. A master program coordinated with local policies can address differing limits and conditions in some cases. AIG’s multinational program guide describes common local and master arrangements. Confirm admission, compulsory insurance, claims payment and local tax implications with qualified advisors for each relevant jurisdiction.
Example of a loss at a foreign installation
A domestic integrator sends technicians to install control cabinets at a customer's overseas site. Handling damage to the cabinets and injury to a worker raise questions about cargo, installation, local workers coverage and the master policy. Record each entity's obligations, contract territory and policy provisions, the worker's status and employment location, and where a claim would be reported and paid. Some U.S. government work overseas can implicate the Defense Base Act, depending on the contract and activities. A private commercial overseas visit should be evaluated on its own facts.
Coordinate local and master records
- Inventory the destination countries, project duration, workers, equipment and contractual certificates or local policy obligations.
- Compare local and master property, liability, employer, auto and professional coverage against the planned operations.
- Confirm claims notice, response contacts, currency, payment and subrogation procedures with relevant teams.
- Obtain territorial review for new contracting entities, subcontractors and project phases before mobilization.
Ask legal, tax and insurance teams to contribute to the same country-by-country schedule. Document gaps and responsibilities before a certificate or bid is issued so insurance terms align with the place where the loss may be handled.

Stress-test the arrangement against a claim before mobilization
Start with two incidents in the project country. One results in a demand against the overseas subsidiary for damage to third-party equipment, while the other requires treatment and return travel for an employee dispatched temporarily. Identify who receives notices, which carrier or service provider can respond locally, whether payments to the foreign entity are permissible, and how documentation travels between local offices and headquarters. Check where legal action can be brought and whether the relevant policy includes the proposed territory, claimant or venue. The local workers and travel arrangements can be evaluated separately from general liability and property.
A multinational program can involve the same corporation under different policy schedules. Record which local policies were issued, which master provisions are intended to coordinate with them and how limits and coverage differences are handled. Ask how deductibles, aggregate reporting, loss payments and currency are managed. For an assignment involving rented gear or borrowed cars, confirm who arranges insurance and whose approvals are needed. Compare contract insurance evidence with the policies actually available in that country. Update the arrangement when a short assignment turns into recurring work or a permanent workforce. Confirm local obligations with qualified advisors rather than assuming existing domestic terms follow the business everywhere.
Give purchasing and onboarding clear approval gates
Require the location, legal entity, site activity and duration before placing overseas work, and identify when an extension changes the arrangement. List home office employees, local hires, contractors and consultants separately. Ask about emergency assistance, cross-border vehicle rental, transit or customs responsibilities and protection for locally hired entities. Review all certificates for accepted limits and issuance by an appropriate insurer, with local advice as needed. The program should state when to seek underwriting review of a new territory or product and how trial activity becomes regular business. This helps the company avoid relying on a broad territory statement for a locally regulated insurance obligation or a claim that requires payment and handling inside the foreign country.
