Choose the guide that matches your role
Start with the entity you actually operate. A single site can include a developer that owns the shell, a construction manager coordinating work, a utility that provides a service point, a separate power operator, a tenant with computing assets and a company that runs the building. Each can have a different repair obligation, source of revenue and contractual duty. The revenue that is interrupted may belong to someone several steps away from the physical damage.
If you are a developer, write down the next event that changes your risk: purchase of an owner-furnished unit, a relocation into outside storage, first power, an integrated test or early occupancy. If you run operating facilities, identify the customer commitments and system dependencies supporting them. If you install or maintain equipment, describe the work precisely, including what you verify, what you design, who supplies the property and who accepts it.
Start at the data hall and work outward
The AI and hyperscale data center library is organized around how campuses, colocation facilities and computing operators maintain service. Begin there if your main assets are a building, data hall, computing equipment or an operating contract. For each hall record who owns the equipment, who pays if it needs replacement, what operating capacity is actually available and how long a qualifying outage might affect income. A common vendor or utility asset may serve several nominally independent areas.
For a new build or retrofit, use the construction and development guide to compare project milestones with the relevant insurance periods. Building a shell, moving a customer into a finished hall and installing equipment next to an operating aisle create different exposures. Check for equipment staged outside the property descriptions and for operations that begin before everyone signs the same acceptance document.
Separate power generation from the power path
The natural gas and LNG guide starts with ownership of generation assets, fuel availability and commercial delivery commitments. Establish whether the plant uses piped natural gas or an arrangement that involves LNG equipment and handling. Describe ownership of generation revenue, campus income and downstream customer commitments independently. A delivery shortfall can affect them at the same time for different reasons.
The power and electrical library addresses the path from utility service to critical equipment and the ability to restore service. Examine the assets that nominally redundant paths share. Confirm the extent to which emergency generation, batteries and alternate service can actually carry expected load and for how long, using the facility team’s documented assumptions. Ask whether the restoration schedule includes specialist labor, factory lead times and recommissioning.

The cooling and mechanical library addresses the other dependency that can constrain usable computing capacity when power remains available. Identify where coolant, heat and monitoring cross ownership boundaries. A loss may affect one customer rack, a shared cooling loop or the entire mechanical plant. The claims and maintenance records needed can differ across those events.
Compare production, installation and managed-service exposures
Semiconductor and electronics manufacturing focuses on the ability to make a qualified product after an incident. Tool restoration, customer acceptance and restarting production are separate steps. A manufacturing submission should identify the time and cost of qualification, the inventory at risk and other facilities qualified to produce the same product.
Telecom and fiber contractors need to distinguish new construction from work that affects occupied networks. Clarify underground or aerial methods, design responsibility, ownership of equipment and emergency restoration commitments. Identify the customers relying on an existing service and whether the contractor assumes obligations beyond property repair.
Robotics and industrial automation spans product manufacturing, integration, field work and remote support. Document which entity accepts the system and how changes are made after handover. A failure in a product, service or customer’s own plant can create similar symptoms and different allegations.
Technology services and managed infrastructure addresses the services an account actually delivers and the upstream companies it depends on. Compare new operations with the insurance application and services definitions. Then compare reimbursement and third-party obligations under the cyber and technology liability guides.
Cross-check the handoff against the insurance program
Consider a partially energized building that relies on rented cooling while permanent equipment is tested. The developer has scheduled rent, a vendor maintains temporary cooling, the operating tenant owns the racks, and one insurer expects occupancy to trigger a policy change. Build the same chronological account for each party. Identify which party could lose property, who would have to pay to avoid downtime and which insured interest would experience a delay. Then match those facts to the available policies, endorsements and contract terms.
Use the coverage library when you know the event or coverage question. Use the Resource Center when the next step is to assemble project information, examine financing or review risk transfer. When ready for a brokerage discussion, bring the record showing owners, dates and dependencies rather than relying on the project name as a summary of exposure.