Identify the service being purchased
Obtain the utility or power provider agreement, current tariff if applicable, operational contacts, and diagrams showing where the supplier's responsibility stops. Document capacity, expected delivery dates, constraints, restoration assumptions, and any curtailment or redundancy provisions. Keep the estimate of what the facility can operate during a disruption separate from a promise in a contract. Use the actual available alternative power arrangements and the systems they serve.
Make the dependency explicit in an example
A large-load facility agrees to a service arrangement with a specified date for full delivery. The site opens a first phase with interim capacity. A utility-side equipment problem interrupts supply, and standby generation supports only some operations. Record the affected service and location, distinguish a delay to planned service from an interruption to existing operations, and quantify the impact on each insured entity or phase. Ask the broker to review any utility service, business income, or project delay wording against those facts.
Gather the useful records
- Identify ownership and responsibility of transformers, feeders, switching gear, and service-side infrastructure.
- Record service conditions, service notices, equipment ownership, and planned or forced curtailment constraints.
- Calculate which loads can shift, which depend on dedicated assets, and time to restore key functions.
- Keep outage logs, communications, and dependency notes required to document time and financial impact.
- Ask counsel and the power adviser to verify contract and tariff requirements that drive project acceptance or restoration.
The Federal Energy Regulatory Commission's PJM co-location proceeding is an example of how arrangements for particular large loads can receive grid-specific treatment. Verify the current tariff, provider agreement, and relevant jurisdiction for the project before relying on a service assumption.

Locate dependencies beyond the meter
In a multi-source design, list sources and subcomponents that are genuinely independent, such as separate substations, incoming paths, transformers, and controls. Ask technical personnel to identify any equipment or communications shared by utility service and on-site alternatives. Estimate hours of available backup fuel and time to replenish where the site relies on it. Capture which essential support systems, such as cooling, monitoring, or access, still depend on the affected source during a supply interruption.
Build a dependency file for financing and underwriting
Include the agreed capacity and delivery dates, provider and customer entities, activities assigned to the site owner, and any dependency on third-party permits, studies, or infrastructure. Identify what happens if a milestone is missed, whether the arrangement includes alternative service, and which commercial commitments depend on the delivery date. Explain the current phase's operational experience separately from the next phase's planned power service.
Ask the broker which provider information, premises boundary, service definitions, or other documentation are relevant to the insurance forms. Have operations define the incident records available from the provider and preserve who can request them. Separate actual utility interruptions from planned curtailment and temporary lack of capacity. The coverage review can compare each event with the wording, including waiting periods and any conditions or sublimits. Reconcile the same facts with financing, schedule, and tenant commitments, so a decision does not rely on an assumption that a service agreement or alternative source will respond as planned.
Compare interim service and ordinary service
A provider might make a temporary configuration available before permanent capacity is reached. Build separate service descriptions for the interim and ordinary periods, with dates and equipment ownership at each point. Document which loads cannot be supported and whether a temporary provider shares the same critical network or infrastructure. Ask the risk team to confirm which period and physical arrangement were supplied to the broker before submitting any revised assumptions about the provider's responsibility or likely outage duration.