A utility connection may be sized, priced, and authorized for a particular use. A campus with private generation should confirm the amount and timing of imports available during planned outages and emergency events, the utility’s notice or scheduling requirements, and the applicable service terms. An engineering drawing can show a physical path without proving the campus can take the required service on short notice.
Translate the agreement into a recovery assumption
Separate import capacity for several uses: ordinary purchases, generation maintenance, contingency loads, and restart of an islanded system. Examine what notice the utility expects and which charges can change when demand exceeds a baseline. Ask what event allows either party to suspend or limit delivery. Have the utility and engineering team confirm whether peak critical load includes cooling, facilities auxiliaries, and a phased restart. In the PJM context, FERC addressed the need for tariff provisions reflecting different levels of service for co-located loads. A buyer should identify market-specific terms with its own utility and counsel. FERC’s PJM co-location fact sheet
Example of partial rather than full restoration
An insured generator suffers a breakdown during an evening peak. The utility can deliver enough standby power for priority halls under the agreement, with less load available to new tenants. The operator buys electricity at a higher cost but continues to provide partial service. Estimate continuing revenues and reasonable loss mitigation by affected hall. Ask how actual time-element and extra-expense language treats purchased electricity, partial return to service, policy limits, and the site’s pre-loss mix of owned and purchased power.

Obtain the approved agreement, utility permission and capacity limits, rate and billing assumptions, protection and ownership exhibits, and observed load data. Label whether each assumption is contractual, engineering-verified, or an estimate.
Ask whether each operating phase can use the same standby plan
A campus commissioning a new hall may have a temporary service agreement while its existing buildings take ordinary power. An engineer may identify a common connection serving both phases, but the utility and commercial contracts could limit when and how that connection is used. Obtain written confirmation of planned service during an unplanned plant outage, a scheduled turbine inspection during peak season, and the ramp after a full campus shutdown. Compare the buyer’s own service terms with any separate utility contract signed by its generator. Identify applicable fees and rights that could change after the campus enters commercial operation.
Compare partial and full service income measures
Assume the project operator can serve half of the affected campus with imports, but two tenant leases contain occupancy payments linked to on-site power capacity. Establish which service obligations actually change and whether any minimum charges or tenant obligations continue. The plant entity may face its own loss of contracted output, and the operator may have to pay additional electricity costs. Calculate these under both the commercial agreements and the respective policies. Review whether a specified provider is an insured dependency and whether coverage for a physical breakdown would treat continued operation, extra expense and insurance periods differently from a third-party service interruption.
Retain the allowed import schedule, actual power available at the meter, billing data, and engineering-certified capacity for each served load. Ask which party can authorize contingency purchases and retain the confirmation with the accepted site continuity plan.