Commercial foundries may produce semiconductor designs on a contract basis for other businesses. The CHIPS commercial fabrication vision paper explains the foundry business model in context. Ownership of wafers, masks, dies and finished components depends on the individual contract. Insurance review should determine which assets the plant owns, which it holds for customers and what value those assets reach at each step.
Align custody records with policy schedules
Create a property ledger that identifies customer, material type, contractual valuation, process stage, location and maximum accumulation. Identify subcontracted testing, storage and transport. Ask the customer and foundry who bears risk while property is away from the facility. The cost of replacing a physical lot can differ from delay damages or lost value asserted by a customer, including sunk processing costs.
Example — a lot is damaged while stored between stages
An event damages material accumulated in one area while several customer orders await the next processing step. A vendor is storing other lots off site. Locate all affected material, verify ownership and value under the contracts, and determine whether replacements can be produced from available inventory. Review policy provisions for property of others, work in process, processing losses, transit or temporary storage and concentration sublimits as applicable. Evaluate allegations of damages to customers separately under the relevant liability provisions. Keep records adequate to trace each lot without disclosing unrelated customer information.
Document the insurance decision
- Customer custody and title terms, including when the value of manufacturing services becomes part of a lot's value.
- Property valuation and maximum concentrations at the fab, at suppliers and in transit.
- Production sequencing and cost to recreate physical intermediates if lost.
- Written allocation of notice, inspections, replacement and custody responsibility.

Put maximum custody values into the contract review
A risk manager should test the potential largest simultaneous accumulation, which can differ from average inventory and accounting values. Check the most valuable lot, the peak queue between process steps and any cluster of material stored for multiple customers. Consider whether amounts that cannot be recovered physically are contractually valued at raw materials cost, completed process cost or another agreed amount. Record co-located dies and masks when inability to replace either class of asset could make recovery harder. Do not promise that the policy will provide the exact valuation required in the supply agreement until the terms have been reconciled.
Case comparison — a subcontractor receives property before a damage event
An outside processor receives and stages several lots. An incident there affects property held for the original fab, and the customer wants to know who will replace stock and pay for extra production services. Obtain custody receipts, location schedules and the other processor's documented obligations. Review the actual policy for property at another premise, valuation, sublimits, qualifying loss and notice. Consider whether the customer's rights and the foundry's obligations depend on the same contract, and whether one carrier will require evidence from another insured. Separate the cost of reproducing lost physical stock from cancellations and disputed service commitments.
For purchasing or renewal, prepare a summary showing the insured entity expected to make each claim, the losses the customer is expected to cover and the responsibility accepted by intermediate facilities. Update the summary when inventory shifts off-site or when an internal storage change increases concentration.