Build an asset boundary register
Map business arrangements to physical equipment. Identify ownership of the building and improvements, mechanical systems, suite fit-out, cross-connects, racks, servers and customer-furnished spares. Record who ordered each asset, who can access or repair it, whether the provider owes restoration, and whether there is a documented duty to arrange insurance. A project may contain property that changes owner at acceptance and remains under another party's control afterward.
Confirm that the service and the insured interest align
The provider may be responsible for power or space availability while the customer controls workloads and owns its IT property. Include evidence of occupancy, terminal points and restoration duties. Document whether provider access is allowed in an emergency and identify the customer contact empowered to approve repair. The NIST cloud computing definition distinguishes service models. For the insurance review, rely on the contract, physical boundaries and activities actually performed.
Example — owner and tenant are affected differently
A leak damages a tenant's accelerator equipment and an operator's distribution infrastructure. The provider restores environmental service before the tenant can replace the equipment. Separate the provider's property and operating costs, the tenant's property and business impacts, and any allegations or contract remedies based on the provider's work. Preserve authorizations, property schedules, and evidence showing when each obligation was satisfied.
Evidence to keep current
- An asset register by bay or demarcation point with ownership, custody, valuation and insurance responsibility.
- The service order, lease and exhibits describing repair duties, notices and remedies, including any assignment or waiver provisions.
- Renewal invoices or contracts establishing earning commitments, restoration milestones and alternate capacity rights.
Use the register to compare coverage of leased equipment, tenant improvements, property of others and income interests without assuming a single policy insures all parties or all assets.

Reconcile the schedule with finance and engineering
Ask finance to identify which entity paid for fit-out, how contractual improvements are accounted for, and whether equipment is owned, financed, leased or accepted under a special project agreement. Ask engineering to identify shared or customer-specific equipment and which components cannot operate until an adjacent asset is restored. For leased property, gather value assumptions, use dates and repair duties from the actual lease and any installation documentation. Record where interim possession and final ownership differ.
Another scenario involves a customer moving a major equipment shipment into an unfinished area before live operation. Several provider and customer assets are damaged during work in the same space. Document who authorized early access, what use had begun, where equipment was stored, and which types of property had been accepted. Identify which policy periods and site or custody definitions could matter across project and operating forms. Do not use the final property owner as the only determinant of notice or coverage. Retain invoices, contracts and photos showing which assets were actually damaged and who has a legal or economic interest in each.
Decisions to settle before occupancy changes
- Who reports a condition or loss involving several property owners, and who sends notices when occupancy starts or storage arrangements change?
- What does the provider promise about restoring the facility, tenant hardware, and the service that depends on both?
- Where do relevant forms insure property of others, a party's legal liability for it, or an interest related to ongoing revenue?
Keep an agreed contact and communications table so the facility can preserve evidence without claiming authority over tenant property or records. A restoration agreement may address the service provider's duties even while insurance investigators evaluate the tenant's interests separately.
When replacing a customer-specific system, obtain evidence of obligations for equivalent performance or approved alternate parts. The asset's booked purchase cost and the contractual cost to restore service can diverge. Ask whether proposed replacement terms, deductibles and spend approvals use the same ownership and valuation assumptions.