Montridge Insurance Services Request a risk review

Resources

Critical supplier dependency worksheet

Map which vendors or facilities can interrupt operations, the alternatives available, and the evidence an insurance review may need.

Crated industrial equipment staged in a warehouse

Draw the dependency graph one service at a time

Start with business functions such as facility cooling, transit, network paths, managed services, or components needed for manufacturing. Identify the direct vendor, underlying provider, locations, shared services that can affect more than one site, and contractual rights to information. For each dependency, record anticipated disruption time, substitutes, manual workarounds, and tolerance before the interruption materially affects operations. Review how quickly an alternate source can actually qualify and begin delivering.

Example involving a shared route

A campus has two last-mile network providers but both connections rely on the same downstream facility. If the shared path is interrupted, the two contracts may offer little practical redundancy for that scenario. Prepare the topology evidence and distinguish an upstream service failure from physical damage to insured premises. Identify which services cannot be rerouted, how many tenants would be affected, and who will be able to verify facts. Ask the broker to check any contingent coverage, including supplier type, triggers, and conditions.

Maintain the fields that change the result

The NIST cyber supply-chain due diligence guide provides a framework for ICT supplier assessment. For other supply chains, apply the analogous dependency questions and verify what the policy requires for the specific risk.

Service vehicle and equipment at an industrial facility

Verify whether apparent alternatives can meet the exposure

Supplier quotes and redundant contract names help identify options. Practical redundancy also depends on the location, physical path, lead time, compatibility, available capacity, and approval needed to switch. Give operations a list to test assumptions such as the ability to take inventory from another vendor, move workloads during a busy period, or use alternate transport for a part with handling restrictions. Record missing evidence and who can obtain it without requesting unnecessary sensitive information.

Trace disruption and evidence rights across tiers

Mark where your direct vendor relies on a lower-tier party to inspect, repair, notify, or release records. Identify whether the original agreement or its supplier terms require notice or access to incident information. Even if the primary vendor controls the relationship, the policy may need a precise description of the affected supplier or premises. Ask the broker how the insured's relevant form describes direct and indirect providers, what kinds of events it contemplates, and the evidence it may require.

Revisit the list when an account changes its vendor, software, major process, or dependence on a single facility. Use a date-stamped version showing the last time the business tested its substitute or verified routing independence. If an event occurs, add the named party's incident timeline, time to resume deliveries, costs of temporary capacity, actual impact on the insured business, and supporting contracts. Document the difference between a probability estimate made during planning and evidence actually obtained after interruption.

Put capacity against your restoration scenario

If a vendor maintains a backup supply but serves several owners in a region, ask what it can commit at the same time that everyone might need it. Obtain documentary support and compare allocation promises with what the company could move by priority. Record who would approve the alternate equipment and the first usable date. Supply that evidence to the broker so the potential interruption estimate accounts for alternative capacity demonstrated by the facts.