Montridge Insurance Services Request a risk review

Industries

Connected Device and IoT Product Manufacturers

Assess product failure, connected services, software support and third-party risk for manufacturers and distributors of industrial connected devices.

Equipment on an automated electronics production line

Explain the product, platform and operating environment

A connected-device manufacturer may ship physical equipment, license onboard firmware and host a platform that the equipment uses. Identify which entity supplies each component, who controls updates, and what the device continues to do if connectivity, remote licensing or a vendor service becomes unavailable. Describe where the device operates and whether an outage has commercial or physical consequences. NIST’s foundational guidance for IoT product manufacturers outlines consideration of product security capabilities and supporting cybersecurity information. Use the actual product features and representations to evaluate those risks.

Illustrative product and service allegation

An equipment distributor receives reports that installed monitoring devices stopped transmitting after a vendor component change. Some customers use those devices as their primary early-warning system. One customer alleges property damage from a missed alert while others demand replacement equipment. Determine whether the allegations concern physical damage, a device defect, an error in connected services, replacement of the product itself or a privacy or security event. Review product liability and the insured technology services and products definitions, and compare separate recall, cyber or product withdrawal wording if purchased. A contractual upgrade or corrective program can involve costs beyond those addressed by the applicable policy.

Documents to prepare before launch or renewal

A product description that names only the physical device may omit the hosted service or software on which customers depend. Explain the complete offering to both the insurance team and the customer.

Industrial robot arm in a protected production cell

Model consequences across different installation types

Separate installations where a device provides optional visibility from installations that rely on the device to meet a defined operational requirement. Some customers may install the product with another monitoring layer; others may treat its alert as their primary indication of a problem. Record the intended use, customer assumptions and whether usage has expanded since the product was introduced. Compare exposure for a single local failure with a supplier change that affects many units at once. Include product value, replacement access, labor and downstream demand in the scenario, while keeping the categories of potential loss distinct.

Know which entity can decide on corrective action

A manufacturer, distributor or platform provider may receive separate complaints about the same product. Clarify who can ask customers to discontinue use, establish the scope of an affected batch, approve corrective action and notify the insurers. Maintain version, serial or lot identification in a form the responsible team can use promptly. Gather representative contracts and note whether customers receive update support through the seller, a different provider or a third-party contractor. Check whether contracts have definitions of product, warranty and support that map to the proposed insurance structure.

Model a field correction that restores service without replacing equipment and a second incident in which physical damage occurs before corrective work. They can present very different liability, warranty and recall questions. Compare insurance terms for actual third-party loss, remedial action and the manufacturer's own work. Any obligation to disclose a problem, preserve records or take action should be reviewed by qualified personnel under the rules applicable to the product and the situation.